Fin joins VHB as Manager of Airport Planning for the Southeast Region. Based in Orlando, Florida, Fin brings nearly two decades in the aviation industry–most recently directing the aviation planning practice for a global engineering consultant. His knowledge of domestic and international regulations, standards, and recommended practices has helped clients solve critical infrastructure and economic objectives, as well as improve traveler experiences.
"Fin adds complex terminal and airside planning capability to our expanding aviation practice at VHB,” said Peter Byrne, Aviation Services Director. “He understands the aviation industry, knows the regulatory challenges, and will take an active role in helping our clients provide the best possible experience for the flying public."
Fin’s experience includes aviation planning projects coast to coast and abroad, including planning for a new international terminal at Las Vegas McCarran International Airport, apron layout planning at the Southwest Florida International Airport, and a comprehensive evaluation of airside and landside operations at Bogota El Dorado International Airport in Columbia. Click here to learn more.
Connect with Fin at fbonset@vhb.com | 407.839.4006
Fairbanks International Airport Baggage Transport Conveyor Enhanced With Mod Drive™ System
Airports face a host of unique industry challenges, such as meeting efficiency regulations and seeking out the best maintenance practices to reduce costs and keep operations flowing. In today’s current economic climate, any potential cost savings can go a long way.
In 2019, Alaska’s Fairbanks International Airport (FAI) sought to modernize its equipment and operations. They were dissatisfied with the performance of the gearmotors on their baggage transport conveyors and began searching for new suppliers. Regal approached FAI with a solution that could improve equipment performance and simplify maintenance, with the added benefit of energy cost savings: the Hub City® MOD Drive™ system.
This white paper discusses the hardware deployed, the test results and the annualized expectations for ROI.