Category - Terminals

Austin-Bergstrom Int'l Relieves Growing Pains With Satellite Terminal for Non-Legacy Carriers

The city of Austin, TX, has been expanding rapidly for the past several years, with no discernable end in sight. Last year, its population grew by 2.9% (nearly 60,000 people) and forecasters predict that the city will reach the 3 million mark before 2030. As of this March, Austin was home to more than 2 million residents.

Manhattan Regional Cleaves Terminal to Rebuild & Expand

Manhattan Regional Airport (MHK), located in the picturesque and growing Flint Hills region of Kansas, cut the ribbon on its new terminal early this year. More than triple the size of the old facility, the new 42,000-square-foot building emerged from the footprint of the existing terminal in an unusual manner. The airport essentially cut its existing terminal in half, and then demolished, rebuilt and expanded each half during separate phases-while maintaining operations the entire time.

Boston Logan Renovates Int'l Terminal to Accommodate Wide-Body

For years, Boston Logan International Airport (BOS) faced a problem many airports would relish: too much passenger demand. Now, BOS can accommodate three of the world's largest passenger jets simultaneously, and plans are set to add more gates in a few years. The fix, a $168 million expansion and renovation to Terminal E, debuted in late January.

Greenville-Spartanburg Int'l Remains Operational Throughout 5-Year Ground-to-Ceiling Rehab

Greenville-Spartanburg International Airport (GSP) recently put the finishing touches on its $127 million Wingspan project, the largest capital improvement initiative ever undertaken at the South Carolina airport. In essence, GSP completely rebuilt its terminal from the ground up, expanding from 225,000 to 375,000 square feet.

Sky Harbor Unveils First Phase of $590 Million Terminal Makeover

Passengers traveling through Terminal 3 at Phoenix Sky Harbor International Airport (PHX) are getting through check-in faster, navigating the TSA screening process more easily and relishing new views of the desert and city-and more improvements are on the horizon.

Illinois County Cuts Ribbon on New Terminal & Renames Airport to Honor Veterans

After 10 years of planning and negotiating and building, Williamson County Airport Authority recently cut the ribbon on its new terminal. To honor local veterans, it changed the name of the entire facility from Williamson County Regional Airport to Veterans Airport of Southern Illinois (MWA) and named the terminal after a local World War II flying ace and former airport authority chair. Fittingly, MWA dedicated the new Captain Robert W. Duncan Airline Terminal on Veterans Day (2016).

Local Donations Help West Michigan Regional Build New Terminal

Local Donations Help West Michigan Regional Build New Terminal
Community support for West Michigan Regional (BIV) in Holland, MI, is highly visible to anyone arriving at the general aviation airport. Literally. Contributors who donated to the "Earn Your Wings" fundraising campaign will be formally recognized on a permanent display in BIV's new Airport Business Center, the primary showpiece of a $7 million improvement program that also added a parking lot and expanded the existing aircraft apron.

Northeast Florida Regional Demolishes Old Terminal & Erects New in 100 Days

While U.S. presidents like to talk about plans for their first 100 days in office, officials at Northeast Florida Regional Airport (SGJ) can proudly show what they accomplished in 100 days. SGJ closed its existing terminal, tore that structure down and constructed a new 14,000-square-foot facility-all while maintaining flights into and out of the airport.

Norfolk Int'l Spruces Up Terminal with $40 million Facelift

With the recent addition of a sweeping skylight in its main lobby, Norfolk International Airport (ORF) finally has the grand connection to nearby botanical gardens its original 1970s design intended. According to ORF officials, the 10,000-square-foot skylight and other elements of the airport's $34 million renovation program create a terminal that is modern and aesthetically stunning, and also more efficient and better equipped to meet current and future passenger needs. A $6 million project updated ORF's general aviation facility.

Charleston Int'l Renovates Terminal Just in Time for Record-Setting Growth

Charleston International (CHS) is no longer a "small town airport," and local officials are thrilled with the change. After six consecutive years of passenger growth, CHS broke its previous 2014 record by moving more than 3.4 million travelers through its terminal last year. Volume is up nearly 1.5 million passengers since 2010.

Years of Record Growth Spur New Terminal at Central Nebraska Regional

New Terminal at Central Nebraska Regional
When Executive Director Michael Olson first came to Central Nebraska Regional Airport (GRI) in 2005, commercial air service was sparse. A few years later, it was completely nonexistent for a brief time. "We knew we had to make some changes to our program," Olson recalls.

Cleveland Hopkins Accelerates Terminal Updates for Republican Convention

When throngs of red, white and blue politicos descend on Cleveland in July for the Republican National Convention, Cleveland Hopkins International Airport (CLE) will greet them with a newly updated ticket lobby and other recent renovations. Between delegates, staffers, journalists, lobbyists and others, the city is expecting 50,000 extra visitors.

New Terminal at Minot Int'l Dramatically Increases Capacity & Prepares Community for Future

For many years, the only escalator in Minot, ND, was at Woolworth's, which also had a lunch counter. Today, there's a new escalator in town-inside the airport's spanking new terminal, and Minot International (MOT) holds its own claim to fame as the largest airport terminal in North Dakota.

Pittsburgh Int'l Installs Terrazzo with Extra Razzle-Dazzle

Travelers passing through Pittsburgh International Airport (PIT) need only look down to see one of the most striking components of the airport's recent multimillion-dollar renovation. The airport replaced its uninspired, dated tile flooring with smooth new terrazzo that serves as the "canvas" for an eye-catching piece of art. The new material also eliminates the familiar racket of suitcases rolling over tile flooring.

Port Columbus Int'l Invests in Existing Facilities, Prepares for Future Construction

The decision to renovate or build new is often viewed as a high-stakes fork in the road, but Port Columbus International (CMH) seems comfortable straddling the common divide. In March, the Ohio airport celebrated the end of an $80 million terminal renovation program while maintaining its options to build a new midfield terminal in the future. Fresh finishes, an infusion of natural lighting and updated mechanicals were completed to bridge the gap until passenger numbers establish a clearer path toward ground-up construction.

Louisville & Ford Int’l Update Brand Identities During Facility Renovations

Terminal renovation projects often provide shiny new flooring, fresh paint and updated fixtures. But they can also be an excellent opportunity to spruce up dated marketing strategies. Gerald R. Ford International and Louisville International are both seizing the chance to renovate their brand identities while remodeling their facilities.

Temporary Sales Tax Raises Funds for New Terminal at Lafayette Regional

Raising money for major construction projects is typically a major challenge, but officials at Lafayette Regional (LFT) recently got the job done in short order with a short-term sales tax earmarked to help fund a new terminal.

Cross Border Xpress — Full-Service Terminal Minus the Aircraft

As of December 9, 2015, travelers flying out of Tijuana’s General Abelardo L. Rodriguez International Airport (TIJ) have a faster and easier way to access the Mexican airport from the U.S. side of the border. Instead of waiting in long lines of vehicles at the San Ysidro or Otay Mesa border crossings, airline passengers can now use the new Cross Border Xpress (CBX) terminal, which spans the U.S.-Mexico border.

Five-Year Terminal Renovation Worth the Wait for Central Wisconsin Airport

Central Wisconsin Airport (CWA) travelers are greeted these days by a newly renovated and expanded terminal. Updates were direly needed, reports Airport Director Tony Yaron; and the nearly $38 million multiphase project took five years to complete. "The terminal was overcrowded and aging," he explains, noting that the facility hadn't been updated since the mid-1980s. "After 9/11, we had to fit a CT-80 screening device into an old travel agency office between the ticketing offices and the street. Travelers had to schlep bags through the lobby."

New International Terminal Opens at Houston Hobby

In mid-October, Houston's William P. Hobby Airport (HOU) opened a new terminal, bringing the world of international travel to its passengers. The five-gate facility is the first international terminal for Southwest Airlines, which fully funded and led the development of the project.

Albert Ellis Airport Sequences Funding to Build Small Terminal with Big-Airport Swag

When was the last time you heard about a significant public facility such as a school or stadium being built without dedicated local tax dollars? Albert J. Ellis Airport (OAJ), just outside of Jacksonville, NC, recently pulled it off. The airport's $43.9 million project added new facilities for commercial and general aviation passengers, plus a wide variety of other airside and landside improvements.

Saskatoon Int'l Nearly Doubles Terminal Size Without Incurring Any Debt

After nearly three years of construction, crews completed the $53 million terminal renovation at Saskatoon John G. Diefenbaker International Airport (YXE) in April, and the improvements are already receiving international recognition. Passengers ranked the Saskatchewan airport number one in North America for comfortable waiting spaces in gate areas via the quarterly Airport Service Quality awards administered by Airports Council International.

Los Angeles Int'l & Delta Unveil $229 Million Terminal 5 Renovation

The $229 million renovation of Terminal 5 in Los Angeles International Airport (LAX) wrapped up this summer on time and on budget, with optimism high about how it will enhance the travel experience for about 6.6 million domestic passengers who use the facility each year. With Delta Air Lines as the terminal's sole airline tenant, the initiative was cooperatively funded by Delta ($11.2 million to renovate its proprietary areas and equipment), a TSA grant ($25 million for inline baggage screening) and nearly $193 million by Los Angeles World Airports (LAWA), which owns and operates LAX, Los Angeles Ontario International and Van Nuys Airport.

Terminal Renovation Helps Myrtle Beach Int'l Flex with Seasonal Traffic

Year after year, Myrtle Beach International Airport (MYR) services half of its annual passenger volume in a short three-month span when tourists flock to area beaches and other Gulf attractions for spring and summer vacations. Thanks to new facilities and recent renovations, the South Carolina airport can expand during its busy season and contract when traffic subsides.

St. Louis Int'l Modernizes Iconic Terminal Without Losing Connection to the Past

"Out with the old, in with the new" is often the sentiment that drives large-scale terminal improvement programs. Lambert-St. Louis International Airport (STL) took a different approach during the recent $70 million renovation of its mid-century Terminal 1, by working to preserve iconic architectural elements while infusing efficiency, flexibility and modern systems to carry the facility into the future.

Pages

FREE Whitepaper

PAVIX: Proven Winner for All Airport Concrete Infrastructure

PAVIX: Proven Winner for All Airport Concrete Infrastructure

International Chem-Crete Corporation (ICC) manufactures and sells PAVIX, a unique line of crystalline waterproofing products that penetrate into the surface of cured concrete to fill and seal pores and capillary voids, creating a long lasting protective zone within the concrete substrate.

Once concrete is treated, water is prevented from penetrating through this protective zone and causing associated damage, such as freeze-thaw cracking, reinforcing steel corrosion, chloride ion penetration, and ASR related cracking.

This white paper discusses how the PAVIX CCC100 technology works and its applications.

 

 




# # #
 

# # #