b'PHOTO: NORFOLK INTLAIRPORTPARKINGORF 29FACTS&FIGURES Project: Parking ImprovementsLocation: Norfolk Intl Airport, in VAFunding: Local & state Key Components: New 3,200-space Garage D; new Park & Wait lot; resurfaced East Lot; space counts systemKey Benefits: Increased parking capacity; improved efficiency; enhanced traveler experience; reduced congestion; potential for future expansionPARKING GARAGE SPACECOUNTS SYSTEMCost: $1.2 millionImplementation: July 2024Jan. 2025Parking Management System: EnSight Technologies, in partnership with FAAC Parking SolutionsParking Reservations System: AeroParkerPARKING GARAGE DCost: $68 millionConstruction: July 2019Nov. 2022Architect of Record: Gresham SmithConstruction: HouriganCivil Engineering & On-Site Owners Representative: Kimley-HornStructural Engineering & Special Inspections: Speight Marshall FrancisConcrete: Baker Concrete ConstructionOn-Site Owners Representative for Safety: RRMM ArchitectsInspections & Materials Testing: GET Solutionsconcrete project. EnSight Technologiesspaces spread across nine levels. SpanningMechanical, Electrical & Plumbing: Pace and FAAC Parking Solutions (HUB Parkingmore than 1.1 million square feet, it isCollaborativeTechnology) were brought in to implementthe largest parking facility at ORF andGarage Functional Design: WGIan advanced AI-based parking guidancesignificantly boosted total parking capacity and occupancy management systemto approximately 10,000 spaces. The garageEAST LOT RESURFACINGthroughout the airports four parking garagescost $68 million. Cost: $650,000(A, B, C and D) and the East surface lot.Gresham Smith crafted the structuresConstruction: Sept. 2024Oct. 2024ORF partnered with Excel Paving Corp. fordesign to blend with existing airport the resurfacing of the East Lot and CompoContractor: Excel Paving Corp.buildings, which include precast elements Construction for the Park & Wait Lot. and a focus on symmetry, order and repetition. The goal with the new garagePARK & WAIT LOT Designing the New Structurewas to contribute to the cohesive exteriorCost: $2 millionThe airports newly constructed Garagecampus aesthetic to make it look like it mayConstruction: Feb. 2024Dec. 2024D opened in late 2022 with 3,200 parkinghave all been built at once, explains Contractor: Compo ConstructionAirportImprovement.comJanuary | February 2025'