b'60 DAN GENERAL AVIATION In the main lobby, designers expanded the passenger waiting area to improve comfort for individual customers and large groups alike. The old plastic rack chairs common in many airports were removed and replaced with new plush chairs and couches. We tried to soften that room a bit, Hasson remarks. We added new lighting and framed images of regional tourist sites. The dominant photo is a large aerial image of the River District, and a new monitor in the lobby promotes tourism activities and local economic development projects.Other elements for the project included:Dividing the existing pilot lounge into two sections. The larger public area has computers and a television; a separate quiet Pilot facilities were upgraded during recent renovations. room allows pilots to shut the shades and relax in reclining chairs. In the terminal, the biggest challenge involved upgrading theRenovating the kitchen with new appliances and bathrooms, which had only three stalls and not enough room forcountertops. In addition, a new wall was built to improve a single piece of luggage. Frankly, they were almost unusable,access. Before, people had to pass through one of the Hasson relates.conference rooms to enter the kitchen. Designers consequently gutted the bathrooms and startedRedesigning all three conference rooms, with better lighting from scratch, adding new plumbing and fixtures as well as a newand local artwork. bathroom with shower facilities for pilots. AIRPORT PROJECTS. SCAN TO WEVE GOT YOU COVERED CHECK OUTOUR FULL LINEOF AIRPORTPRODUCTS NEW LED TECHNOLOGYRUNWAY CLOSURE MARKERSLONG LASTING LED | FAA CERTIFIED | MADE IN AMERICA Graco Line Striper Low Profile Barricade No Tools NeededRunway Closure Markers800.525.8876 | SHERWININDUSTRIES.COMContract # 110122-SWNMarch | April 2024AirportImprovement.com'