b'TERMINALSRNO 9FACTS&FIGURES Project: Ticketing Hall Expansion Structural & Site Concrete: & Renovation Concrete NorthLocation: Reno-Tahoe Intl Airport,Terrazzo: Corradiniin NV Expansion Joints: Expansion Size of Expansion: 10,000 sq. ft. SpecialtiesRenovated Space: 30,000 sq. ft.Under-floor Ducts: WalkerductCost: $31 million for Ticketing HallFireproofing & Insulation:interior; $17.5 million for associatedGale Building Productsexterior work & Loop Road improvements Curtainwall & Storefront: Giroux Funding: Cash; temporary letter Glassof credit; CARES Act grant Ceiling Tiles: ArmstrongConstruction: Oct. 2022Structural Steel: Reno Iron WorksApril 2024Key Components: Expanded queueElectrical: Helix Electric& ticketing space; new restrooms;Inspection: Constructionrelocated elevator core; energy-efficientMaterials Engineerslighting; updated mechanical system;Bathroom Accessories:digital, intuitive wayfinding; updatedHenri Specialtiescurbside signage; exterior bollards for added security Metal Roofing: Kodiak RoofingArchitecture, Planning, ProjectMetal Siding: ALUCOBONDManagement, Interior Design,Glazing Supplier: Guardian GlassStructural Engineering, BIMFraming/Drywall/Paint/Exterior Coordination, StakeholderInsulation Finishing System/Engagement, Low VoltageAcoustic Ceiling Tile: M&H PHOTO: RENO-TAHOE AIRPORT AUTHORITY Common Use Only: RS&H Building SpecialtiesGeneral Contractor: McCarthySurvey: MapcaBuilding Companies Inc.Exterior Design: Kimley-Horn Wall & Floor Tiler: National Ceramic Tile & Stone Corp.Exterior Construction/SelectiveReinforcing Steel: Northern Nevada Demolition: Q&D Construction LLC RebarCivil Engineering, GeotechnicalFire Sprinkler System:Survey: Overhead Fire ProtectionWood Rodgers Inc.Mechanical, Plumbing, Civil/Utilities: Reno Tahoe Fire Protection Engineering:ConstructionAinsworth Associates MechanicalHVAC Ductworkfor the architectural expansion work. Kimley-Horn provided planningEngineers & Hydronics: Ryan Mechanicaland design for the Loop Road, including a complete reconstructionElectrical Engineering, LowPlumbing: Savage & Sonof the roadway to improve accessibility, safety, aesthetics and theVoltage (IT/Comm/Security): PKArchitectural Millwork:customer experience, as well as the design of the roadway gradingElectrical Inc. Victory Woodworksand drainage and the bollard system and canopy additions. Q&DSignage/Wayfinding: SelbertAV/Security/Communications: Construction executed the Loop Road work and continues to improvePerkins Design Collaborative Teledata Technologiesdrop-off and pick-up areas, sidewalks, crosswalks and additionalCost Estimating: M Lee Corp. Elevator: Koch Elevatorsexterior infrastructure for the project.Structural Masonry: Bollards: GibraltarAmazon MasonryTemporary ConstructionWhere, How and When to Expand Doors & Hardware: American DoorWalls: SwiftWallThe project teams determined the best option to expand the TicketingInstallationArchitectural Metal Panels: AndyFinal Clean: CC CleaningHall was to push out to the west, taking advantage of a very deep curbRusso Jr./B&B Specialties Key Benefits: Increased space to front with room to spare. They came up with the idea to just kind ofhandle passenger growth; improved Roofing: Commercial Roofers passenger experience; enhanced securityAirportImprovement.comJuly | August 2024'