This past May, Dallas Fort Worth International Airport (DFW) opened an extension of Terminal D, its primary international terminal. Although the $202 million project added just four gates, the impact on operational capacity and customer satisfaction is expected to be tremendous.
This summer, just as passengers returned in significant numbers, Seattle-Tacoma International Airport (SEA) opened Phase 2 of its $710 million North Satellite modernization project, adding much-needed gates and square footage.
L.F. Wade International Airport (BDA) is passengers' gateway to the iconic pink sand beaches of Bermuda. With an economy heavily rooted in tourism, this overseas territory of the United Kingdom and its airport have struggled since early 2020 because of COVID-19. However, in December 2020, a new $400 million terminal opened to welcome travelers to the Atlantic island.
Fredericton International Airport (YFC), in Canada's far northeast corner, was built more than a half century ago to accommodate 200,000 passengers annually. The original building and facilities served their purpose aptly until about 10 years ago, when the New Brunswick airport began experiencing steady growth.
When Akron-Canton Airport (CAK) completed a $37 million gate modernization and concourse expansion last fall, the northeast Ohio airport also celebrated the culmination of its 10-year, $115 million capital improvement program. Together, the projects update the 1960s terminal, allow it to accommodate all current aircraft and right size the facility for future growth.
In April, the Washington, D.C., airport unveiled its new 14-gate concourse, a 230,000-square-foot facility built to replace its remote and cramped Gate 35X. Until recently, about 6,000 American Airline passengers rode airside buses every day to Gate 35X, where they boarded regional jets parked at 14 hardstand gates. The arrangement was the airport's way of continuing vital service while demand stretched beyond its contiguous facilities.
Ever feel like the finish line keeps moving farther away' Jon Stout, airport manager at Charles M. Schulz'Sonoma County Airport (STS) in Santa Rosa, CA, knows just what you mean. Stout and his team are in the midst of a $31 million terminal expansion and renovation that began in November. But even when they cut the ribbon in fall 2022, STS will only have 70% of the recommended space to handle its peak passenger volume.
Replacing a dated and inefficient building, the new terminal includes more space, updated security and several firsts for APN: a passenger boarding bridge, an automated baggage system and airside restrooms. While adding the new amenities, the airport and design team also managed to pay homage to the region's rich industrial background, storied maritime history and rustic Northwoods surroundings.
The new Concourse D at Nashville International Airport (BNA®) didn't just add gate capacity and new customer amenities. It is also facilitating future expansion to help the Tennessee airport cope with years of explosive growth in passenger volume. Operations from elsewhere at BNA have moved into the new concourse to allow remodeling and construction of other areas.
New signage is making it easier for drivers to navigate Broward County's Fort Lauderdale-Hollywood International (FLL). A comprehensive project substantially completed in December replaced aging signs with brighter, easier-to-read LED displays.
The new terminal, set to open in January 2021, is 91,000 square feet, with four gates that can accommodate four narrow-body aircraft simultaneously. The entry hall features an expansive 45-foot glass wall that bathes check-in, baggage claim and a meet-and-greet area in natural sunlight. The TSA checkpoint exceeds minimum design standards to prepare BRO for evolving security requirements.
In mid-September, Salt Lake City International (SLC) unveiled the first phase of its $4.1 billion redevelopment project, a comprehensive series of much-needed operational and aesthetic upgrades throughout the entire airport.