63 AirportImprovement.com September 2026 BAGGAGE PGD The design includes space for an additional baggage makeup carousel in case another is needed in the future. Broad Input Minimizing disruption during construction became a guiding principle from the earliest stages of design. Representatives from every airport department reviewed construction plans and identified potential operational conflicts before work began. “We included all of our teams in the discussion,” Laroche says. “Everybody got to look at the plan and have input.” That collaborative approach helped the project team develop strategies that kept passengers moving as construction progressed. And because AECOM designed the new baggage facility as a standalone addition, travelers were not in areas where work was occurring. “It wasn’t as bad as you might think from a passenger experience,” Henriquez says. “Ninety percent of the project didn’t impact the public. It impacted airport operations, but not the public.” When making critical tie-ins between the new baggage system and existing terminal, crews worked at night and coordinated construction activities to minimize noise and operational disruptions. When inline screening went live this January, PGD operated the old and new baggage handling systems simultaneously for several weeks to create a smooth transition. “This way, if the new system went down, we still had the old system to use as a backup,” Laroche says. Schedule Hiccups The project team hit an unexpected obstacle when AECOM realized the airport lacked the electrical infrastructure needed to power the new system. “We had to bring in new three-phase service immediately,” Henriquez recalls. To improve resiliency, engineers added an emergency generator designed to keep critical portions of the baggage handling system operational during power outages. The generator is sized for the inline baggage project and the terminal expansion currently under construction. “At many airports, the baggage handling system can’t function during a power outage,” Hass adds. “We wanted to give the airport limited baggage handling and screening functionality when the power went out.” EXPLORE SOLUTIONS Delivering integrated solutions that help airports and airlines manage complexity, improve operations and deliver passenger-centered infrastructure ready for today’s needs and tomorrow’s growth. We Build What Moves Aviation Forward
View this content as a flipbook by clicking here.