b'18 BNA TERMINALSA full concessions lineup provides passengers with a main terminal experience. systems, as well as telecommunications backbone and horizontal cabling Planning and Design|Program & Construction Managementand infrastructure. To accommodate Facilities Management|IT|Asset Management construction of the Satellite Concourse, the firm also planned the relocation of an existing perimeter intrusion detection Arora Engineers was proud to lead the Special Systemssystem (PIDS) in seven phases to ensure Engineering Services as a subconsultant to Corgan, along withthere was coverage at all times. Temporary Gresham Smith and Holder Construction, for the BNA Satellitedual-technology sensors were installed, and Concourse Project at Nashville International Airport. a new stand-alone solar power and wireless comms were established as a temporary source to support continued operation of the PIDS throughout construction until permanent power and data connections were made at the new Satellite Concourse. Fiberoptic backbone cabling was extended from the main terminal to the new building to serve all the special systems as an extension of existing systems at main terminal. To accomplish this, a new underground duct bank with sufficient capacity for the new cabling was installed, and part of the existing underground duct Image courtesy of Corgan bank was also used. We added multi-cell fabric inner duct aroraengineers.com|Rethinking Infrastructureto run the new fiberoptic cables, which Atlanta | Baltimore | Boston | Dallas | Los Angeles | Miami | New York | Orlandoallows us to meet the current needs of the Philadelphia | St. Petersburg | San Jose | Bangluru, India| Pune, India project but also gives the airport future May | June 2024AirportImprovement.com'