36 TERMINALS November | December 2026 AirportImprovement.com LBF America’s Great Plains are a physical manifestation of the term wide open spaces. But the longtime terminal at Nebraska’s North Platte Regional Airport Lee Bird Field (LBF)? Not so much. Built nearly 75 years ago, the building’s cramped terminal was a vestige of a bygone era. The holdroom seating was beyond inadequate and its bathrooms were likewise subpar. The only food or drinks to be had were inside a tired scattering of vending machines. Even worse, over the 25 years since the Sept. 11 terror attacks, LBF too often moved travelers through the TSA checkpoint and then straight outdoors. There wasn’t enough indoor space to hold a planeload of people, not even for smaller 50-seat aircraft. When space limitations forced LBF to pass up an explosives detections system two years ago, TSA put the airport on notice. Without security upgrades, its commercial air service would be at risk. “(The terminal) looked its age,” acknowledges Justin Gosnell, who has been at LBF for 10 years, including the past three as airport manager. All of these challenges were erased in mid-August with the debut of an all-new, nearly $30 million passenger terminal just east of the building it replaced. Federal, state and local leaders heralded the single- story, 24,000-square-foot development as the region’s most significant investment in commercial aviation infrastructure in decades. Upgrades include the airport’s first passenger boarding bridge, larger restrooms and food and beverage service on both sides of the security checkpoint. There’s space for modern TSA equipment, and a 110-seat holdroom has ample room for the airport’s current passenger volume – as well as extra capacity should an airline add service with larger aircraft in the future. JUSTIN GOSNELL North Platte Regional Replaces Old Terminal With Updated Version Built for Growth BY CHRIS JONES
View this content as a flipbook by clicking here.