9 AirportImprovement.com November | December 2026 TERMINALS BUR increases functionality and enhances the passenger experience—from arrival to departure. Parking, ticketing, check-in, security and boarding are all streamlined with updated technology and intuitive wayfinding. A 45,900-square-foot aircraft ramp, new roadway network and six-level parking structure further improve efficiency of the overall campus. Community Consensus BUR is owned and operated by the Burbank- Glendale-Pasadena Airport Authority, a government agency created under a joint powers agreement between its three namesake cities in 1977. The ELEVATE BUR program began in earnest November 2016 when voters in the city of Burbank approved a measure about building a replacement passenger terminal, with specific requirements for the development agreement and an environmental impact report. “That vote was overwhelming,” Hatanaka reports. “It was 70% in favor of moving forward.” He attributes the decisive margin to a grass-roots effort led by community members who saw the benefits of a new terminal. While the vote clearly indicated a desire to improve the aging midsized airport, the associated development agreement included stipulations about growth. In particular, the new terminal could not have more than 14 gates—the same number as the existing terminal. The agreement also required financial responsibility. “We were able to achieve very good bond sales and interest rates, which helped with our overall finance plan,” notes Hatanaka. FACTS&FIGURES Project: New Terminal Location: Hollywood Burbank Airport, in CA Owner/Operator: Burbank-Glendale-Pasadena Airport Authority Strategy: New terminal on greenfield site replaces previous terminal built in 1930 Size: 355,000 sq. ft. Associated Projects: 6-level parking garage with 2,007 self-park spaces & 400 valet spots; support buildings; associated roadways Total Budget: $1.3 billion Funding: FAA Airport Improvement Program grants; passenger facility charge revenue; Airport Authority funds; General Airport Revenue Bonds issued by the Authority Key Components: Continuation of ground loading; 14 hybrid gates able to accommodate all Class III aircraft; seismic improvements; fully compliant airfield; 43 check-in counters; 3 bag claim carousels; single, centralized checkpoint with 8 lanes; architectural & design elements that convey glamour of Old Hollywood; new & expanded concessions program Sustainability Features: All-electric terminal, with energy-efficient lighting & water fixtures, daylighting, photovoltaic panels; charging stations for electric vehicles in parking garage; electric ground support equipment; connections to regional transit network Noteworthy Challenge: Building site had 33-ft. slope change; environmental restrictions limited grading to top 25 ft. Delivery Method: Progressive design-build Project Timeline: Voter authorization Nov. 2016; groundbreaking Jan. 2024; grand opening Oct. 13, 2026 Project Manager: Jacobs Financial Consultant: Ricondo & Associates Construction Joint Venture: Holder, Charles Pankow Builders, TEC Management Lead Architect & Designer: Corgan Architectural Consultants: CannonDesign; Nwankpa Design Lead Technology Consultant: Burns Engineering Structural Engineers: Buehler Engineering; Walter P. Moore MEP Engineer: Syska Hennessy Group with PBS Engineers Lighting Design: Horton Lees Brogden Minority Outreach & Procurement Consultant: PDA Consulting Group Common-Use Technology: SITA Baggage Handling System: VTC Inc. Portable Solar-Powered Boarding Ramps: KCI GSE Custom Ceilings & Walls: Arktura, an Armstrong brand Exterior Glazing & Curtainwall: Architectural Glass & Aluminum
View this content as a flipbook by clicking here.