56
WINTER OPERATIONS        
November | December 2026      AirportImprovement.com
APA 
One of the main challenges 
at Centennial Airport (APA) in 
Englewood, CO, is keeping the 
runways and taxiways open during severe 
winter weather. And in that neck of the 
woods, snowy conditions are common. 
In addition to accommodating charter 
flights, private aircraft, military operations 
and medevac services, APA also regularly 
receives diversions from airports in Aspen 
and Eagle, CO. Waiting for the weather to 
pass is not typically an option— especially 
for aircraft on lifesaving missions.  
“We are one of 
the busiest general 
aviation airports in 
the country,” says 
Executive Director 
Mike Fronapfel.  
In all, APA logged 
about 305,000 
operations in 2025, and Fronapfel expects 
the 2026 total to be even higher. “We 
would have had more operations last 
year, but we had a shortage of air traffic 
controllers,” he shares. “This year, the 
control tower is fully staffed again, so I 
expect significantly more operations 
this year.”   
Fortunately, APA has two new multi-
function snow machines with plowing, 
sweeping and blowing capabilities to 
support its snow removal operations. 
An Oshkosh HT Truck and Oshkosh XT 
Broom that cost $1.1 million each were 
ordered in 2022, and the airport took 
delivery in fall 2024 and early 2025. 
The vehicles were selected for their 
ability to quickly clear airfield pavement 
and adapt to fluctuating weather 
conditions. According to Fronapfel, 
the new equipment can clear APA’s 
10,000-foot main runway and chief 
taxiways in about 35 minutes. “Our 
previous equipment would have taken 
approximately the same amount of 
time to clear the main runway and chief 
taxiways, but it required three different 
people operating three 
separate pieces of 
equipment,” notes 
Maintenance Director 
Matt Smith. “The 
primary advantage 
of the new machines 
isn’t necessarily a 
reduction in the overall 
clearing time, but rather that one operator 
can now accomplish the work using 
a single multi-function machine. More 
importantly, the new equipment provides a 
much cleaner finished product, removing 
significantly more of the compacted snow 
and ice from the runway, leaving a better 
surface for aircraft operations.”
Centennial Airport Improves 
Snow Removal Operations BY MIKE SCHWANZ
MIKE FRONAPFEL
MATT SMITH
FACTS&FIGURES 
Project: Upgrading Snow Removal Fleet
Location: Centennial Airport, in Englewood, CO
Main Runway: 10,000 ft. long, 100 ft. wide
New Equipment: Oshkosh* HT Truck & XT Broom for 
plowing, sweeping & blowing snow
Local Dealer: O.J. Watson
Cost: $1.1 million/vehicle
Funding: Airport’s general operating budget
Timeline: Vehicles ordered in 2022, delivered in Nov. 
2024 & Feb. 2025
Key Benefit: Faster, more efficient snow removal
Other Snow Removal Equipment: 18 pieces total, 
including a 2025 MB4 Snowblower; 2013 Western Star 
with Epoke deicer; 2004 Oshkosh P-Series plow
Annual Operations: 305,000 (including 6,107 
medevac)
Main Medevac Providers: Children’s Hospital 
Colorado; Flight for Life Colorado; iCare Ambulance
FBOs: Jet Centers of Colorado; Signature Flight Support; 
Modern Aviation 
Based Tenants: 125
Associated Project: Expanding snow removal 
equipment building 
Cost: $4.5 million
Funding: Airport’s general operating budget
Completed: Feb. 2024
Key Benefits: Room for new multi-function vehicles; 
rest area for crew members 
* In July 2023, Aebi Schmidt Group acquired Oshkosh 
Corporation’s Snow Products business and integrated the 
line into its subsidiary M-B Companies.

View this content as a flipbook by clicking here.