b'92 PGVHANGARSPHOTO: APRIL CANNONFACTS&FIGURES Project: New Corporate HangarsLocation: Pitt-Greenville AirportGreenville, NC Pitt-Greenville Uses Pandemic Scope: 5 hangars Stimulus Funds for New Hangars Hangar Sizes: 4 with 13,200 sq. ft. of space; 1with 6,400 sq. ft. of spaceApprox. Cost: $9.8 million ($9.1 construction;BY CLAIRE HANNUM$336,000 design; $336,000 construction managementWhen one door shuts, theresFour are 13,200 square feet, spacious & administration) always an open window nearby.enough to hold a Gulfstream G650. The fifth Funding: Nearly $9.8 million from CARES Act; $9,000And COVID slammed a lot ofhangar is 6,400 square feet, with enough room from Airport Authority doors. When commercial traffic at Pitt- for a Bombardier Challenger 300. The hangars Construction: July 2022-March 2023 Greenville Airport (PGV) took a severe diphave hydraulic lift doors and offer direct Civil Engineers: Talbert & Bright during the global COVID-19 pandemic, theaccess to PGVs corporate taxi lane. The four Contractor: Farrior & Sons North Carolina airport did more than open alarger hangars feature space for an office or window. It built its own doorson five newpilot lounge partitioned by fire-rated walls.Structural Engineers: RPA Engineering hangars for corporate aircraft. Plumbing, Electrical & MechanicalThe $9.8 million dollar project is among Engineers: Atlantec Engineers The construction project was thethe first of its kind in the U.S. to be funded Architect: Dunn & Dalton Architects Pitt-Greenville Airport Authoritys waythrough the CARES (Coronavirus Aid, Relief, of generating a new source of revenueand Economic Security) Act, a federal Hangar Doors: Southeast PowerLift in the fast-changing pandemic-ravagedpandemic stimulus package launched in Hydraulic Doors Inc.landscape. Certificates of occupancy were2020. Im very excited that weve had this Key Benefits: Add new revenue stream; offsetreceived in March, and all five hangars areopportunity to build these hangars and pandemic-induced losses; support local economicalready open for business. basically not take on any debt and own developmentSeptember 2023AirportImprovement.com'