b'88 COSRUNWAYSprojects typically dont have such a long preconstruction period. Crews milled and overlayedBeyond the pavement work, the project included several other 11,022 feet of runway pavement.significant airfield improvements: upgrading the runways existing incandescent lighting to LEDs relocating the precision-approach path indicators (PAPIs)raising the supplemental wind conesseal-coating the blast pads and runway shouldersadding new regulators for the airfield lighting controlsinstalling a new flywheel-driven backup generator to eliminate the need to burn diesel fuel during weather-induced power outagesrelocating the airport beacon to increase visibility and Ryan Konen, the project managerenhance safetyresponsible for Kiewits performance on theThere were some long-lead items and permitting complications job, had completed two other projects atthat dictated we push construction by a year, recalls Konen. COS before the recent runway rehab. In hisIts important to understand this was 11,000 feet of pavement estimation, the companys Colorado Springsthat is 150 feet wide with 30-foot shoulders, about 210 feet wide office has become something of a trainingaltogether. When you add in all the lighting, cabling, navigational center for developing its future leaders,equipment, and the critical nature of these systems working and the limited construction window for theRYAN KONEN perfectly after being installed in just 90 days, its a lot to consider.expansive 17R-35L project is an excellent example of why. The complexities of coordinated shutdowns, the constantThis project was bid in April of 2020, but construction didntneed for over-communication and challenges associated with start until May of 2021, says Konen, noting that most bid-buildsecuring and installing specialized navigational lighting are part and parcel with commercial airfield work. But the project teamHEICO-LOCKSustainable SolutionsWEDGE LOCK WASHER BOLTfrom Recovery and Beyond . . .SECURITY SYSTEMSAviation Planning and DesignFAA Approved Solutions for Your AirfieldStandard wedge lock washers and Combi-Washers from HEICO-LOCK: Keep your lights secure Reduce maintenance headaches Airside/Landside/ Eliminate risk of FOD Keep costs down Facilitieschacompanies.com#theCHAwayPaul Puckli Mike DeVoy, PE703.625.4889 317.780.7232WWW.HEICO-LOCK.US888.822.5661 ppuckli@chacompanies.com mdevoy@chacompanies.comSeptember 2022AirportImprovement.com'