b'The new corporate hangar includes76 HSAHANGARS2,500 square feet of office space. In recent years, Hancock County has added 230 new jobs and seen nearly $100 million in private capital investment in aerospace development. Additionally, the next generation of aerospace workforce will be trained locally at a $10 million development center that Pearl River Community College plans to build at the airport.Meeting Tenant RequirementsBoth of the airports newly constructed hangars and the 13,125-square-foot hangar it purchased for $844,000 have already been leased.CUSTOM TENSION FABRIC BUILDINGS Tyonek Services Group, an aircraft SUPERIOR PERFORMANCE.maintenance company that serves both private and public sector clients, is leasing RAPID INSTALLATION. the RESTORE hangar. Because the lease agreement was reached when construction was nearly complete, a change order was Fully Customizable Concept to Installation needed for Drace Construction Corp. to Fast-Track Construction Patented Attachment System upgrade the hangars fire protection system. In-House Engineering Relocatable As a service provider for the U.S. Department of Defense, Tyonek is required to operate from a building with a foam fire suppression Call for more information, or to receive a quotesystem instead of the sprinkler system 877.259.1528| LEGACYBUILDINGSOLUTIONS.COM specified in the original hangar design. September 2022AirportImprovement.com'